Scheduling a Single Machine with Primary and Secondary Objectives
We study a scheduling problem in which jobs with release times and due dates are to be processed on a single machine. With the primary objective to minimize the maximum job lateness, the problem is strongly NP-hard. We describe a general algorithmic scheme to minimize the maximum job lateness, with...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-06-01
|
Series: | Algorithms |
Subjects: | |
Online Access: | http://www.mdpi.com/1999-4893/11/6/80 |