Optimization and Application of Spacing Parameter for Loosening Blasting with 24-m-High Bench in Barun Open-Pit Mine

In view of the near slope blasting in Barun open-pit mine, which has merged sublevel mining, the operation safety conditions of middle-sized and large equipment in the second phase expansion are poor and need urgent improvement. To increase the efficiency of expansion and reduce costs, a 24-m-high b...

Full description

Bibliographic Details
Main Authors: Zuoming Yin, Desheng Wang, Xuguang Wang, Zhiheng Dang, Wantao Li
Format: Article
Language:English
Published: Hindawi Limited 2021-01-01
Series:Shock and Vibration
Online Access:http://dx.doi.org/10.1155/2021/6670276