New Ashton Arch – functional assessment of direct and indirect construction costs and evaluation of service life with respect to flooding risk.
The bridge crossing the Cogmanskloof River in the town of Ashton, South Africa, had a history of over-topping due to severe flood events. The poor flood resilience of the bridge was aggravated by the generally hydraulically inefficient openings, the number of substructure supports in the river cours...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201819906003 |