Minimizing the Duration of Repetitive Construction Processes with Work Continuity Constraints
This study adopts the flow shop concept used in industrial production to schedule repetitive non-linear construction projects, where specialized groups of workers execute processes in work zones (buildings) in a predefined order common to all groups. This problem is characteristic of construction pr...