IMPROVING THE ACCURACY OF SHORT-TERM LOAD FORECASTING OF DELIVERY POINT CLUSTER OF THE SECOND LEVEL DEFAULT PROVIDER
Relevance of the discussed issue is caused by the need to improve the accuracy of short-term load forecasting of delivery point cluster of the second level default provider. The system operator uses the result of forecast when forming power system dispatch load curve. Usually, prediction errors lead...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Tomsk Polytechnic University
2020-06-01
|
Series: | Известия Томского политехнического университета: Инжиниринг георесурсов |
Subjects: | |
Online Access: | http://izvestiya.tpu.ru/archive/article/view/2682/2248 |