Studies of rational methods of water selection in water intake areas of hydroelectric power plants
Up to 2021, 42 new hydropower stations will be created in Uzbekistan and 32 existing hydropower stations will be repaired. Hydraulic engineering designers face a number of problems with the open flow division nodes in the field, which are part of the hydraulic structures of such hydropower plants. C...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_05041.pdf |