A study of thermal effort during half-hour start-up and shutdown of a 400 MW steam power plant spherical Y-pipe

The subject of considerations is a spherical Y-pipe made of the 91 steel, which is an element of a coal-fired power plant unit working with a 18K370 turbine. Two scenarios for such a unit have been adopted: a fast scenario, in which the turbine is shutting down to a warm state three times in 24 h an...

Full description

Bibliographic Details
Main Author: Bartosz Kraszewski
Format: Article
Language:English
Published: Elsevier 2020-10-01
Series:Case Studies in Thermal Engineering
Online Access:http://www.sciencedirect.com/science/article/pii/S2214157X20304706