A study of thermal effort during half-hour start-up and shutdown of a 400 MW steam power plant spherical Y-pipe
The subject of considerations is a spherical Y-pipe made of the 91 steel, which is an element of a coal-fired power plant unit working with a 18K370 turbine. Two scenarios for such a unit have been adopted: a fast scenario, in which the turbine is shutting down to a warm state three times in 24 h an...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-10-01
|
Series: | Case Studies in Thermal Engineering |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2214157X20304706 |