Overload Control Strategy Based on Triangular Fuzzy Analytic Hierarchy Process

After the high-voltage transmission line is cut off due to a fault, the bearing transmission power will be transferred, which may cause overload. If overload cannot be eliminated quickly and scientifically, it is very likely that the line backup protection will be activated, which will trigger chain...

Full description

Bibliographic Details
Main Author: Wang Heng
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/32/e3sconf_posei2021_02019.pdf