Efficient dam break flood simulation methods for developing a preliminary evacuation plan after the Wenchuan Earthquake
The Xiaojiaqiao barrier lake, which was the second largest barrier lake formed by the Wenchuan Earthquake had seriously threatened the lives and property of the population downstream. The lake was finally dredged successfully on 7 June 2008. Because of the limited time available to conduct an inunda...
Main Authors: | Y. Li, J. H. Gong, J. Zhu, L. Ye, Y. Q. Song, Y. J. Yue |
---|---|
Format: | Article |
Language: | English |
Published: |
Copernicus Publications
2012-01-01
|
Series: | Natural Hazards and Earth System Sciences |
Online Access: | http://www.nat-hazards-earth-syst-sci.net/12/97/2012/nhess-12-97-2012.pdf |
Similar Items
-
Simulating dam-breach flood scenarios of the Tangjiashan landslide dam induced by the Wenchuan Earthquake
by: X. Fan, et al.
Published: (2012-10-01) -
Experimental Research on the Dam-Break Mechanisms of the Jiadanwan Landslide Dam Triggered by the Wenchuan Earthquake in China
by: Fu-gang Xu, et al.
Published: (2013-01-01) -
Characteristics and classification of landslide dams associated with the 2008 Wenchuan earthquake
by: Xuanmei Fan, et al.
Published: (2017-04-01) -
Taylor's power law in the Wenchuan earthquake sequence with fluctuation scaling
by: P. Shi, et al.
Published: (2019-06-01) -
The Mechanic Model of Tension-shearing Landslide Triggered by Wenchuan Earthquake
by: Z. Pei, et al.
Published: (2015-12-01)