Efficient dam break flood simulation methods for developing a preliminary evacuation plan after the Wenchuan Earthquake
The Xiaojiaqiao barrier lake, which was the second largest barrier lake formed by the Wenchuan Earthquake had seriously threatened the lives and property of the population downstream. The lake was finally dredged successfully on 7 June 2008. Because of the limited time available to conduct an inunda...