A Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of re...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University, Qazvin Branch
2014-09-01
|
Series: | Journal of Optimization in Industrial Engineering |
Subjects: | |
Online Access: | http://www.qjie.ir/article_152_05fece0a7b6447e234c9442943bcc6f1.pdf |