Flood Routing Process and High Dam Interception of Natural Discharge from the 2018 Baige Landslide-Dammed Lake
The outburst flood of the Baige landslide dam caused tremendous damage to infrastructure, unfinished hydraulic buildings, roads, and bridges that were built or under construction along the Jinsha River. Can downstream hydraulic buildings, such as high dams with flood control and discharge function,...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2020-02-01
|
Series: | Water |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-4441/12/2/605 |