Design of Groundwater Extraction in Open Cut Foundation Pit and Simplified Calculation of Ground Subsidence due to Dewatering in Sandy Pebble Soil Strata
In order to study the design of incomplete well point for groundwater extraction in open cut foundation pit in which the inner and outer aquifers are not completely isolated and the change mechanism of ground subsidence due to dewatering in the foundation pit, an open cut foundation pit for a subway...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/1046937 |