Numerical Simulation of the Construction Process of Long Spiral CFG Piles

A numerical model for the construction process of long spiral CFG piles is established based on the coupled Eulerian–Lagrangian method. The construction process is divided into drilling process and concrete pouring process for modeling. The influence of long spiral CFG piles construction on saturate...

Full description

Bibliographic Details
Main Authors: Taotao Wang, Siyi Du
Format: Article
Language:English
Published: Hindawi Limited 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6664474