Interaction analysis of bucket bottom knife with soil to build up subbase
Introduction. To solve the problem of accelerating the construction of roads, improving their quality, it is advisable to use a continuous action unit to form a underlying layer. The main working elements of this unit are buckets, which cut off the soil layer from below and side. At the same time, t...
Main Author: | |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Siberian State Automobile and Highway University
2020-11-01
|
Series: | Вестник СибАДИ |
Subjects: | |
Online Access: | https://vestnik.sibadi.org/jour/article/view/1142 |