A Multi-Agent Based Simulation Model for Rail–Rail Transshipment: An Engineering Approach for Gantry Crane Scheduling
Le Havre Port Authority is putting into service a multimodal hub terminal with massified hinterland links (trains and barges) in order to restrict the intensive use of roads, to achieve a more attractive massification share of hinterland transportation and to provide a river connection to its mariti...
Main Authors: | Mohamed Nezar Abourraja, Mustapha Oudani, Mohamed Yassine Samiri, Dalila Boudebous, Abdelaziz El Fazziki, Mehdi Najib, Abdelhadi Bouain, Naoufal Rouky |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2017-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/7972950/ |
Similar Items
-
Simulation optimization based ant colony algorithm for the uncertain quay crane scheduling problem
by: Naoufal Rouky, et al.
Published: (2019-01-01) -
Determination of Rectification Corrections for Semi Gantry Crane Rail Axes in the Local 3D Coordinate System
by: Filipiak Daria, et al.
Published: (2015-02-01) -
APRICOIN: An Adaptive Approach for Prioritizing High-Risk Containers Inspections
by: Mohamed Yassine Samiri, et al.
Published: (2017-01-01) -
Control of Gantry and Tower Cranes
by: Omar, Hanafy M.
Published: (2014) -
An investigation of overhead crane wheel/rail/girder interaction
by: Perez Winkler, A. R.
Published: (2012)