Optimal movement of the suspended payload
This paper presents one of the possible ways to optimize the movement of the suspended payload. Application of presented optimization procedure is shown on grab crane devices such as unloading bridge and harbour crane. The optimization procedure is divided into two phases. The first phase is optimiz...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Belgrade - Faculty of Mechanical Engineering, Belgrade
2013-01-01
|
Series: | FME Transactions |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/1451-2092/2013/1451-20921303202B.pdf |