Lean approach in precast concrete component production

Purpose This study applied the lean approach to the reinforcement work process in the component production of industrialised building system precast concrete construction (IBSPCC). The purpose of this paper is to identify and eliminate non-value added (NVA) activities to enhance the efficiency of th...

Full description

Bibliographic Details
Main Authors: Ahmad, S (Author), Goodier, C (Author), Soetanto, R (Author)
Format: Article
Language:English
Published: 2019
Subjects:
Online Access:View Fulltext in Publisher
LEADER 01995nam a2200217Ia 4500
001 10.1108-BEPAM-02-2018-0051
008 220223s2019 CNT 000 0 und d
245 1 0 |a Lean approach in precast concrete component production 
260 0 |c 2019 
650 0 4 |a Industrialized Building System (IBS) 
650 0 4 |a Lean approach 
650 0 4 |a Non-value added (NVA) activity 
650 0 4 |a Precast concrete construction (PCC) 
650 0 4 |a Process improvement 
650 0 4 |a Reinforcement work process 
856 |z View Fulltext in Publisher  |u https://doi.org/10.1108/BEPAM-02-2018-0051 
520 3 |a Purpose This study applied the lean approach to the reinforcement work process in the component production of industrialised building system precast concrete construction (IBSPCC). The purpose of this paper is to identify and eliminate non-value added (NVA) activities to enhance the efficiency of the production process. Design/methodology/approach Data were collected via a case study of six-storey precast concrete building. A mapping of the reinforcement work process was conducted based on observations using time study technique and time-lapsed video, complemented by semi-structured interviews. Findings Through this application, several NVA activities, such as unnecessary inventory, excessive movement and coordination issues, were identified. Production performance could be enhanced by implementing Just-in-Time, Kanban, and layout improvements, which would address NVA activities. Originality/value This paper focusses on strategies for improving the efficiency of the IBSPCC production process in Malaysian construction by developing a conceptual framework of the lean approach for the reinforcement work process. Certain aspects in the process such as layout and inventory need to be redesigned and simplified by minimising NVA activities. 
700 1 0 |a Ahmad, S  |e author 
700 1 0 |a Goodier, C  |e author 
700 1 0 |a Soetanto, R  |e author 
773 |t BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT