Time Connection of Subsequent Construction Processes Estimated by Statistical Method
An integral part of managing the construction of investment units is the monitoring of labor productivity using statistical methods in combination with construction software. Such a combination includes a number of methods and modeling, among which is a method for determining the probability of the...
Main Authors: | Kubečková, D. (Author), Smugala, S. (Author) |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI
2022
|
Subjects: | |
Online Access: | View Fulltext in Publisher |
Similar Items
-
Time Connection of Subsequent Construction Processes Estimated by Statistical Method
by: Kubečková, D., et al.
Published: (2022) -
Evaluation of in silico protein secondary structure prediction methods by employing statistical techniques
by: Kandavelmani Angamuthu, et al.
Published: (2017-01-01) -
Statistical valuation of vibrations at the rock drilling
by: Zuzana Chlebová, et al.
Published: (2006-12-01) -
The Work Sample Verification and the Calculation of the Statistical, Mathematical and Economical Probability for the Risks of the Direct Procurement
by: Lazăr Cristiana Daniela, et al.
Published: (2017-01-01) -
USING STATISTICAL SURVEY IN ECONOMICS
by: Delia TESELIOS, et al.
Published: (2012-01-01)