Improvements to the weak-post W-beam guardrail
"Recent full-scale crash tests of the weak-post W-beam guardrail system have resulted in unsatisfactory collision performance as evaluated by the National Cooperative Highway Research Program (NCHRP) Report 350. Since acceptable crash test performance is required in order to use a guardrail on...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Published: |
Digital WPI
2000
|
Subjects: | |
Online Access: | https://digitalcommons.wpi.edu/etd-theses/894 https://digitalcommons.wpi.edu/cgi/viewcontent.cgi?article=1893&context=etd-theses |
id |
ndltd-wpi.edu-oai-digitalcommons.wpi.edu-etd-theses-1893 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-wpi.edu-oai-digitalcommons.wpi.edu-etd-theses-18932019-03-22T05:50:08Z Improvements to the weak-post W-beam guardrail Engstrand, Klas E "Recent full-scale crash tests of the weak-post W-beam guardrail system have resulted in unsatisfactory collision performance as evaluated by the National Cooperative Highway Research Program (NCHRP) Report 350. Since acceptable crash test performance is required in order to use a guardrail on a Federal-Aid Highway in the United States, the poor performance of the weak-post W-beam guardrail is a significant problem to those states that use it. The goal of this project was to improve the impact performance of the weak-post W-beam guardrail system so that it satisfies the requirements of NCHRP Report 350 at test level three." 2000-06-23T07:00:00Z text application/pdf https://digitalcommons.wpi.edu/etd-theses/894 https://digitalcommons.wpi.edu/cgi/viewcontent.cgi?article=1893&context=etd-theses Masters Theses (All Theses, All Years) Digital WPI Malcolm H. Ray, Advisor Frederick L. Hart, Department Head finite element analysis guardrail system splice connection post-rail connection |
collection |
NDLTD |
format |
Others
|
sources |
NDLTD |
topic |
finite element analysis guardrail system splice connection post-rail connection |
spellingShingle |
finite element analysis guardrail system splice connection post-rail connection Engstrand, Klas E Improvements to the weak-post W-beam guardrail |
description |
"Recent full-scale crash tests of the weak-post W-beam guardrail system have resulted in unsatisfactory collision performance as evaluated by the National Cooperative Highway Research Program (NCHRP) Report 350. Since acceptable crash test performance is required in order to use a guardrail on a Federal-Aid Highway in the United States, the poor performance of the weak-post W-beam guardrail is a significant problem to those states that use it. The goal of this project was to improve the impact performance of the weak-post W-beam guardrail system so that it satisfies the requirements of NCHRP Report 350 at test level three." |
author2 |
Malcolm H. Ray, Advisor |
author_facet |
Malcolm H. Ray, Advisor Engstrand, Klas E |
author |
Engstrand, Klas E |
author_sort |
Engstrand, Klas E |
title |
Improvements to the weak-post W-beam guardrail |
title_short |
Improvements to the weak-post W-beam guardrail |
title_full |
Improvements to the weak-post W-beam guardrail |
title_fullStr |
Improvements to the weak-post W-beam guardrail |
title_full_unstemmed |
Improvements to the weak-post W-beam guardrail |
title_sort |
improvements to the weak-post w-beam guardrail |
publisher |
Digital WPI |
publishDate |
2000 |
url |
https://digitalcommons.wpi.edu/etd-theses/894 https://digitalcommons.wpi.edu/cgi/viewcontent.cgi?article=1893&context=etd-theses |
work_keys_str_mv |
AT engstrandklase improvementstotheweakpostwbeamguardrail |
_version_ |
1719006290167988224 |