Coupled operation of a wind farm and pumped storage facility: techno-economic modelling and stochastic optimization.

This thesis applies a stochastic programming approach to the techno-economic analysis of a wind farm coupled with a pumped storage facility. The production of an optimal day-ahead generating schedule is considered. Wind forecasts contain an element of random error, and several methods of addressin...

Full description

Bibliographic Details
Main Author: Wild, Kristin
Other Authors: Crawford, Curran
Language:English
en
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/1828/3761
id ndltd-uvic.ca-oai-dspace.library.uvic.ca-1828-3761
record_format oai_dc
spelling ndltd-uvic.ca-oai-dspace.library.uvic.ca-1828-37612015-01-29T16:51:51Z Coupled operation of a wind farm and pumped storage facility: techno-economic modelling and stochastic optimization. Wild, Kristin Crawford, Curran Djilali, Nedjib wind energy stochastic programming renewable energy pumped storage This thesis applies a stochastic programming approach to the techno-economic analysis of a wind farm coupled with a pumped storage facility. The production of an optimal day-ahead generating schedule is considered. Wind forecasts contain an element of random error, and several methods of addressing this uncertainty in the optimization process are compared. The methods include robust and reliability-based design optimization in addition to a combination of both approaches, and results indicate that reliability-based design optimization is best-suited to this particular problem. Based on a set of wind forecast error scenarios and historical data, a probability-weighted forecast wind generation scenario set is developed. Reliability constraints are imposed to meet a minimum of 80% of the generating schedule time intervals. This methodology is applied to a case study on Vancouver Island. Preliminary results show that when compared to the base case of a standalone wind farm on Vancouver Island, a wind farm coupled with pumped storage can prove to be economically competitive with pumped storage capital costs below $1.53 million/MW installed pumped storage capacity and a firm energy price of $130/MWh. Graduate 2011-12-22T17:40:46Z 2011-12-22T17:40:46Z 2011 2011-12-22 Thesis http://hdl.handle.net/1828/3761 English en Available to the World Wide Web
collection NDLTD
language English
en
sources NDLTD
topic wind energy
stochastic programming
renewable energy
pumped storage
spellingShingle wind energy
stochastic programming
renewable energy
pumped storage
Wild, Kristin
Coupled operation of a wind farm and pumped storage facility: techno-economic modelling and stochastic optimization.
description This thesis applies a stochastic programming approach to the techno-economic analysis of a wind farm coupled with a pumped storage facility. The production of an optimal day-ahead generating schedule is considered. Wind forecasts contain an element of random error, and several methods of addressing this uncertainty in the optimization process are compared. The methods include robust and reliability-based design optimization in addition to a combination of both approaches, and results indicate that reliability-based design optimization is best-suited to this particular problem. Based on a set of wind forecast error scenarios and historical data, a probability-weighted forecast wind generation scenario set is developed. Reliability constraints are imposed to meet a minimum of 80% of the generating schedule time intervals. This methodology is applied to a case study on Vancouver Island. Preliminary results show that when compared to the base case of a standalone wind farm on Vancouver Island, a wind farm coupled with pumped storage can prove to be economically competitive with pumped storage capital costs below $1.53 million/MW installed pumped storage capacity and a firm energy price of $130/MWh. === Graduate
author2 Crawford, Curran
author_facet Crawford, Curran
Wild, Kristin
author Wild, Kristin
author_sort Wild, Kristin
title Coupled operation of a wind farm and pumped storage facility: techno-economic modelling and stochastic optimization.
title_short Coupled operation of a wind farm and pumped storage facility: techno-economic modelling and stochastic optimization.
title_full Coupled operation of a wind farm and pumped storage facility: techno-economic modelling and stochastic optimization.
title_fullStr Coupled operation of a wind farm and pumped storage facility: techno-economic modelling and stochastic optimization.
title_full_unstemmed Coupled operation of a wind farm and pumped storage facility: techno-economic modelling and stochastic optimization.
title_sort coupled operation of a wind farm and pumped storage facility: techno-economic modelling and stochastic optimization.
publishDate 2011
url http://hdl.handle.net/1828/3761
work_keys_str_mv AT wildkristin coupledoperationofawindfarmandpumpedstoragefacilitytechnoeconomicmodellingandstochasticoptimization
_version_ 1716729398311256064