Guidelines for scope of work in corporate office building design.
Project process\' hindrances over office architectural design production are common at civil construction sector, implying on schedule loss, reworks and higher costs. Many academic literature approaches to that hindrance resulted from failure in project process. Predominantly failures concern t...
Main Author: | Julião, Mariana Lopes |
---|---|
Other Authors: | Melhado, Silvio Burrattino |
Format: | Others |
Language: | en |
Published: |
Biblioteca Digitais de Teses e Dissertações da USP
2018
|
Subjects: | |
Online Access: | http://www.teses.usp.br/teses/disponiveis/3/3153/tde-01032019-151600/ |
Similar Items
-
Guidelines for scope of work in corporate office building design.
by: Mariana Lopes Julião
Published: (2018) -
Gerenciamento de escopo de projeto de arquitetura em edifícios de saúde
by: Fernanda Canesin Gomes Conterato
Published: (2018) -
Gerenciamento de escopo de projeto de arquitetura em edifícios de saúde
by: Conterato, Fernanda Canesin Gomes
Published: (2018) -
ANALYSIS OF DESIGN SCOPE FOR PRODUCING VERTICAL NON-LOADBEARING MASONRY
by: Alberto Casado Lordsleem Jr., et al.
Published: (2011-05-01) -
Incerteza – Uma praga na estimativa de projetos
by: Antonio Mendes Silva Filho
Published: (2012-12-01)