Scheduling strategies for the furniture industry
Technological developments and more demanding production standards have constantly been pushing the envelope, changing the perception of what is possible and desired in manufacturing processes. Such improvements are often made at marginal cost, yet have the potential to significantly benefit perform...
Main Author: | Hugo Soares da Costa Faria Pires |
---|---|
Other Authors: | Faculdade de Engenharia |
Format: | Others |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | https://hdl.handle.net/10216/135138 |
Similar Items
-
Critical factors in make or buy analysis: a case in the technical furniture industry
by: Serafim Filipe Silva Rosas de Araújo
Published: (2019) -
TAsk Scheduling for Multiples Robots in an Industrial Environment
by: Vítor Emanuel dos Santos Lousas Alves da Mota
Published: (2019) -
Produção de Scrap na Pigment Furniture Factory: Análise e Ações Mitigadoras
by: Carlota Pinto de Gouveia Pestana da Silva
Published: (2019) -
Otimização do Processo de Pintura Spray na Pigment Furniture Factory
by: Tânia Lopes Brito Diniz
Published: (2019) -
Grid Scheduling Strategies for Applications that require DataTransfer
by: Kiran Ali
Published: (2019)