An Expert System Integrated with a Bridge Information Management System (BrIMS), Cost Estimating, Deterioration Forecasting, and Linear Scheduling at the Conceptual Design Stage

Major bridge stakeholders such as federal and provincial transportation agencies are in dire need for objective knowledge-based systems that assist decision-makers in the selection of bridge type. Besides that, estimating bridge construction costs at the conceptual design stage is an increasing nece...

Full description

Bibliographic Details
Main Author: Markiz, Nizar
Other Authors: Jrade, Ahmad
Language:en
Published: Université d'Ottawa / University of Ottawa 2018
Subjects:
Online Access:http://hdl.handle.net/10393/37195
http://dx.doi.org/10.20381/ruor-21467