Fluvial erosion measurements of streambank using Photo-Electronic Erosion Pins (PEEP)

Fluvial erosion incites significant bridge scour and large-scale bank erosion causing estimated $1.1 billion damage in the Midwest. Conventional, manual, field monitoring methods, typically erosion pins, cross-section resurveys or terrestrial photogrammetry, used to monitor fluvial erosion rates mer...

Full description

Bibliographic Details
Main Author: Bertrand, Fabienne
Other Authors: Papanicolaou, Athanasios
Format: Others
Language:English
Published: University of Iowa 2010
Subjects:
Online Access:https://ir.uiowa.edu/etd/642
https://ir.uiowa.edu/cgi/viewcontent.cgi?article=1827&context=etd
Description
Summary:Fluvial erosion incites significant bridge scour and large-scale bank erosion causing estimated $1.1 billion damage in the Midwest. Conventional, manual, field monitoring methods, typically erosion pins, cross-section resurveys or terrestrial photogrammetry, used to monitor fluvial erosion rates merely provide a net change in bank surface retreat since the previous measurement. If mass wasting has occurred, the ongoing fluvial erosion would be masked. Erosion event timing, and the precise bank response to individual flow or flow hydrograph changes, is generally uncertain. Thus, a technique that automatically quantifies bank erosion on a continuous basis is needed. This study will monitor the bank response to individual flow (i.e., fluvial erosion) using the Photo-Electronic Erosion Pin (PEEP) sensors in Clear Creek Iowa. It attends to monitor a full episode of bank change, including event timings and magnitude information for specific erosion and deposition events, which can be compared to flow discharges and hydrographs. If exploited, this method can lead to more detailed analysis of bank erosion related to temporal fluctuations in the suspected hydraulic forces.