Analysis of an Existing Coal Fired Power Generation Facility with Recommendations for Efficiency and Production Improvement
This study examined the Lake of Egypt Power Plant operated by Southern Illinois Power Cooperative located on the Lake of Egypt south of Marion, IL. The facility has a 173 MW rated turbine operating on a pulverized coal cyclone boiler and three 33 MW rated turbines operating on an oversized circulat...
Main Author: | Achelpohl, Scott Alan |
---|---|
Format: | Others |
Published: |
OpenSIUC
2010
|
Subjects: | |
Online Access: | https://opensiuc.lib.siu.edu/theses/378 https://opensiuc.lib.siu.edu/cgi/viewcontent.cgi?article=1385&context=theses |
Similar Items
-
Assesment of group regulation feasibility in thermal power plant auxiliaries capacity control
by: Viktor Vanin, et al.
Published: (2020-12-01) -
Ash fouling monitoring and key variables analysis for coal fired power plant boiler
by: Shi Yuanhao, et al.
Published: (2015-01-01) -
Heat Transfer Efficiency Prediction of Coal-Fired Power Plant Boiler Based on CEEMDAN-NAR Considering Ash Fouling
by: Yuanhao Shi, et al.
Published: (2021-07-01) -
Fouling of Air Cooled Condensers On the Air Side
by: Matune, Nicholas J.
Published: (2012) -
Efficient Utilization of Auxiliary Information on Estimation of Population Mean Using Exponential Type Estimators in Successive Sampling
by: Surya K. Pal, et al.
Published: (2017-11-01)