Simplified Framework Evaluation of Large Water Resource Project Impacts

The document most frequently used to support a water resource project's economic feasibility is the commercial benefit-cost analysis, which quantifies tangible and direct project consequences. The objective of this type of analysis is simply to maximize net monetary benefits. This analysis assi...

Full description

Bibliographic Details
Main Author: Clowes, Brian Woodbridge
Format: Others
Published: PDXScholar 1988
Subjects:
Online Access:https://pdxscholar.library.pdx.edu/open_access_etds/1203
https://pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=2202&context=open_access_etds
id ndltd-pdx.edu-oai-pdxscholar.library.pdx.edu-open_access_etds-2202
record_format oai_dc
spelling ndltd-pdx.edu-oai-pdxscholar.library.pdx.edu-open_access_etds-22022019-10-20T04:36:26Z Simplified Framework Evaluation of Large Water Resource Project Impacts Clowes, Brian Woodbridge The document most frequently used to support a water resource project's economic feasibility is the commercial benefit-cost analysis, which quantifies tangible and direct project consequences. The objective of this type of analysis is simply to maximize net monetary benefits. This analysis assigns an arbitrary monetary value to ecological and social disruptions, if it does not ignore these effects entirely. An improvement on this method is the social benefit-cost analysis, which assesses sane intangible costs such as air and noise pollution. Unfortunately, even the social analysis usually neglects the sometimes profound effects that a large water resource project has upon quality of life, particularly with regards to massive relocations. The purpose of this dissertation is to resolve these problems by presenting a method by which a water resource study team may use five unique viewpoints - technical, organizational, personal, social, and environmental - to quantify and compare the true benefits and costs of project construction and operation. The study team begins by rigorously documenting the three general categories of project consequence (economic, social and environmental) and assigning each benefit or cost a relative value within category according to perceived positive or negative effects. The second step is to use these quantifications to produce three impact vs. dam height curves. The final and most difficult step in this study process is to assign a relative weight to the respective economic, social, and enviromental impact clusters, depending on national priorities and the biases and personal viewpoints of the decisiomaker (s). The final product of this procedure is a single curve which is used to further investigate and assess the overall feasibility of a water resource project and the 'optimum' range of dam heights. All of the possible impacts of a large water resource project, whether they be tangible or intangible, should be investigated in order to produce an authentic indicator of project efficiency. The only way to insure that all impacts are properly accounted for is to perform an exhaustive examination of a water resource project from the five perspectives mentioned above. The body of this dissertation is an example analysis based upon the proposed Three Gorge Dam and Reservoir on the Yangtze River in the People's Republic of China. This project will be the world's largest power plant at 13,000 megawatts. Because of its size, anticipated impacts, and the interest it has generated all over the world, the Three Gorge project is considered the ideal subject of a comprehensive multiple perspective analysis as described in this study. 1988-01-01T08:00:00Z text application/pdf https://pdxscholar.library.pdx.edu/open_access_etds/1203 https://pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=2202&context=open_access_etds Dissertations and Theses PDXScholar Three Gorge Project -- Cost effectiveness Water resources development -- Cost effectiveness
collection NDLTD
format Others
sources NDLTD
topic Three Gorge Project -- Cost effectiveness
Water resources development -- Cost effectiveness
spellingShingle Three Gorge Project -- Cost effectiveness
Water resources development -- Cost effectiveness
Clowes, Brian Woodbridge
Simplified Framework Evaluation of Large Water Resource Project Impacts
description The document most frequently used to support a water resource project's economic feasibility is the commercial benefit-cost analysis, which quantifies tangible and direct project consequences. The objective of this type of analysis is simply to maximize net monetary benefits. This analysis assigns an arbitrary monetary value to ecological and social disruptions, if it does not ignore these effects entirely. An improvement on this method is the social benefit-cost analysis, which assesses sane intangible costs such as air and noise pollution. Unfortunately, even the social analysis usually neglects the sometimes profound effects that a large water resource project has upon quality of life, particularly with regards to massive relocations. The purpose of this dissertation is to resolve these problems by presenting a method by which a water resource study team may use five unique viewpoints - technical, organizational, personal, social, and environmental - to quantify and compare the true benefits and costs of project construction and operation. The study team begins by rigorously documenting the three general categories of project consequence (economic, social and environmental) and assigning each benefit or cost a relative value within category according to perceived positive or negative effects. The second step is to use these quantifications to produce three impact vs. dam height curves. The final and most difficult step in this study process is to assign a relative weight to the respective economic, social, and enviromental impact clusters, depending on national priorities and the biases and personal viewpoints of the decisiomaker (s). The final product of this procedure is a single curve which is used to further investigate and assess the overall feasibility of a water resource project and the 'optimum' range of dam heights. All of the possible impacts of a large water resource project, whether they be tangible or intangible, should be investigated in order to produce an authentic indicator of project efficiency. The only way to insure that all impacts are properly accounted for is to perform an exhaustive examination of a water resource project from the five perspectives mentioned above. The body of this dissertation is an example analysis based upon the proposed Three Gorge Dam and Reservoir on the Yangtze River in the People's Republic of China. This project will be the world's largest power plant at 13,000 megawatts. Because of its size, anticipated impacts, and the interest it has generated all over the world, the Three Gorge project is considered the ideal subject of a comprehensive multiple perspective analysis as described in this study.
author Clowes, Brian Woodbridge
author_facet Clowes, Brian Woodbridge
author_sort Clowes, Brian Woodbridge
title Simplified Framework Evaluation of Large Water Resource Project Impacts
title_short Simplified Framework Evaluation of Large Water Resource Project Impacts
title_full Simplified Framework Evaluation of Large Water Resource Project Impacts
title_fullStr Simplified Framework Evaluation of Large Water Resource Project Impacts
title_full_unstemmed Simplified Framework Evaluation of Large Water Resource Project Impacts
title_sort simplified framework evaluation of large water resource project impacts
publisher PDXScholar
publishDate 1988
url https://pdxscholar.library.pdx.edu/open_access_etds/1203
https://pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=2202&context=open_access_etds
work_keys_str_mv AT clowesbrianwoodbridge simplifiedframeworkevaluationoflargewaterresourceprojectimpacts
_version_ 1719271225514000384