Cost as an independent variable : implementation issues.

This thesis will examine challenges defense department managers face when implementing the cost as an independent variable (CAIV) concept of cost control. The CAIV concept replaces the design-to-cost (DTC) concept which only achieved limited success. Emphasis is placed on identifying issues that man...

Full description

Bibliographic Details
Main Author: Henningsen, David.
Other Authors: Boudreau, Michael W.
Language:en_US
Published: Monterey, California. Naval Postgraduate School 2012
Online Access:http://hdl.handle.net/10945/8159
id ndltd-nps.edu-oai-calhoun.nps.edu-10945-8159
record_format oai_dc
spelling ndltd-nps.edu-oai-calhoun.nps.edu-10945-81592014-11-27T16:07:27Z Cost as an independent variable : implementation issues. Henningsen, David. Boudreau, Michael W. Jones, Lawrence R. This thesis will examine challenges defense department managers face when implementing the cost as an independent variable (CAIV) concept of cost control. The CAIV concept replaces the design-to-cost (DTC) concept which only achieved limited success. Emphasis is placed on identifying issues that managers faced implementing the DTC concept. These issues are analyzed to determine the potential cause of the issue and the impact the issue may have on programs implementing CAIV. It is the contention of this thesis that the CAIV concept and the DTC concept are in theory, virtually identical. Many of the same issues will surface during CAIV implementation that managers faced implementing DTC. CAIV may become another ineffective cost control measure. However, DTC was not usually implemented as intended by the guidance. In addition, acquisition reform has provided the manager implementing the CMV concept significant advantages over previous managers. With full management support, programs implementing the CAIV concept can succeed and provide cost effective systems that meet the needs of the user 2012-08-09T19:19:08Z 2012-08-09T19:19:08Z 1997 Thesis http://hdl.handle.net/10945/8159 ocn640487800 en_US Monterey, California. Naval Postgraduate School
collection NDLTD
language en_US
sources NDLTD
description This thesis will examine challenges defense department managers face when implementing the cost as an independent variable (CAIV) concept of cost control. The CAIV concept replaces the design-to-cost (DTC) concept which only achieved limited success. Emphasis is placed on identifying issues that managers faced implementing the DTC concept. These issues are analyzed to determine the potential cause of the issue and the impact the issue may have on programs implementing CAIV. It is the contention of this thesis that the CAIV concept and the DTC concept are in theory, virtually identical. Many of the same issues will surface during CAIV implementation that managers faced implementing DTC. CAIV may become another ineffective cost control measure. However, DTC was not usually implemented as intended by the guidance. In addition, acquisition reform has provided the manager implementing the CMV concept significant advantages over previous managers. With full management support, programs implementing the CAIV concept can succeed and provide cost effective systems that meet the needs of the user
author2 Boudreau, Michael W.
author_facet Boudreau, Michael W.
Henningsen, David.
author Henningsen, David.
spellingShingle Henningsen, David.
Cost as an independent variable : implementation issues.
author_sort Henningsen, David.
title Cost as an independent variable : implementation issues.
title_short Cost as an independent variable : implementation issues.
title_full Cost as an independent variable : implementation issues.
title_fullStr Cost as an independent variable : implementation issues.
title_full_unstemmed Cost as an independent variable : implementation issues.
title_sort cost as an independent variable : implementation issues.
publisher Monterey, California. Naval Postgraduate School
publishDate 2012
url http://hdl.handle.net/10945/8159
work_keys_str_mv AT henningsendavid costasanindependentvariableimplementationissues
_version_ 1716721210003292160