The ashore infrastructure requirements needed to support Mobile Maintenance Facilities (MMF) for intermediate maintenance on the next generation aircraft carrier (CVNX)
Approved for public release; distribution is unlimited === Intermediate Level Aviation Mobile Maintenance is currently conducted by the United States Marine Corps (USMC), Marine Aviation Logistics Squadrons (MALS) and also the USMC and United States Navy (USN) Electronic Warfare Community using a ty...
Main Author: | |
---|---|
Other Authors: | |
Language: | en_US |
Published: |
Monterey, California. Naval Postgraduate School
2012
|
Online Access: | http://hdl.handle.net/10945/7996 |
id |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-7996 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-79962015-07-02T16:03:27Z The ashore infrastructure requirements needed to support Mobile Maintenance Facilities (MMF) for intermediate maintenance on the next generation aircraft carrier (CVNX) Watt, Michael R. Lewis, Ira Eaton, Don Approved for public release; distribution is unlimited Intermediate Level Aviation Mobile Maintenance is currently conducted by the United States Marine Corps (USMC), Marine Aviation Logistics Squadrons (MALS) and also the USMC and United States Navy (USN) Electronic Warfare Community using a type of Mobile Facility (MF). The system is designed to be flexible and adaptable to changing mission requirements. This thesis investigates whether the same type of system could be utilized on the next generation aircraft carrier (CVNX). The shipboard and ashore locations for the MF are investigated and the appropriate time to move them ashore as well. The proposed system is examined from an ashore perspective, and the infrastructure required to support the MF when offloaded from the aircraft carrier identified. The responsibility. transportation, site plan, complexing, power requirements, and manning issues are each addressed for the proposed system. The analysis of the proposed system reveals that the costs associated with: procurement, configuration, transportation. ancillary gear, and maintenance to implement the proposed system are quite large. Also, the manning at both the shipboard and ashore commands would need to adjust as well. The changes required to execute the proposed system would require extensive investment and the return on this investment would not be realized until all aircraft carriers had implemented the proposed system 2012-08-09T19:18:01Z 2012-08-09T19:18:01Z 1999-12 Thesis http://hdl.handle.net/10945/7996 en_US Monterey, California. Naval Postgraduate School |
collection |
NDLTD |
language |
en_US |
sources |
NDLTD |
description |
Approved for public release; distribution is unlimited === Intermediate Level Aviation Mobile Maintenance is currently conducted by the United States Marine Corps (USMC), Marine Aviation Logistics Squadrons (MALS) and also the USMC and United States Navy (USN) Electronic Warfare Community using a type of Mobile Facility (MF). The system is designed to be flexible and adaptable to changing mission requirements. This thesis investigates whether the same type of system could be utilized on the next generation aircraft carrier (CVNX). The shipboard and ashore locations for the MF are investigated and the appropriate time to move them ashore as well. The proposed system is examined from an ashore perspective, and the infrastructure required to support the MF when offloaded from the aircraft carrier identified. The responsibility. transportation, site plan, complexing, power requirements, and manning issues are each addressed for the proposed system. The analysis of the proposed system reveals that the costs associated with: procurement, configuration, transportation. ancillary gear, and maintenance to implement the proposed system are quite large. Also, the manning at both the shipboard and ashore commands would need to adjust as well. The changes required to execute the proposed system would require extensive investment and the return on this investment would not be realized until all aircraft carriers had implemented the proposed system |
author2 |
Lewis, Ira |
author_facet |
Lewis, Ira Watt, Michael R. |
author |
Watt, Michael R. |
spellingShingle |
Watt, Michael R. The ashore infrastructure requirements needed to support Mobile Maintenance Facilities (MMF) for intermediate maintenance on the next generation aircraft carrier (CVNX) |
author_sort |
Watt, Michael R. |
title |
The ashore infrastructure requirements needed to support Mobile Maintenance Facilities (MMF) for intermediate maintenance on the next generation aircraft carrier (CVNX) |
title_short |
The ashore infrastructure requirements needed to support Mobile Maintenance Facilities (MMF) for intermediate maintenance on the next generation aircraft carrier (CVNX) |
title_full |
The ashore infrastructure requirements needed to support Mobile Maintenance Facilities (MMF) for intermediate maintenance on the next generation aircraft carrier (CVNX) |
title_fullStr |
The ashore infrastructure requirements needed to support Mobile Maintenance Facilities (MMF) for intermediate maintenance on the next generation aircraft carrier (CVNX) |
title_full_unstemmed |
The ashore infrastructure requirements needed to support Mobile Maintenance Facilities (MMF) for intermediate maintenance on the next generation aircraft carrier (CVNX) |
title_sort |
ashore infrastructure requirements needed to support mobile maintenance facilities (mmf) for intermediate maintenance on the next generation aircraft carrier (cvnx) |
publisher |
Monterey, California. Naval Postgraduate School |
publishDate |
2012 |
url |
http://hdl.handle.net/10945/7996 |
work_keys_str_mv |
AT wattmichaelr theashoreinfrastructurerequirementsneededtosupportmobilemaintenancefacilitiesmmfforintermediatemaintenanceonthenextgenerationaircraftcarriercvnx AT wattmichaelr ashoreinfrastructurerequirementsneededtosupportmobilemaintenancefacilitiesmmfforintermediatemaintenanceonthenextgenerationaircraftcarriercvnx |
_version_ |
1716807728915021824 |