Localized Electromagnetic Directed Disrupter Device (LED3) HSI Trade-Off Analyses
Consider the impact on the program if maintenance personnel must provide repair of 20 systems (rather than 8 – 10 systems as currently envisioned) Consider domains such as Personnel, HFE, or Training (not necessarily all three) as a means to compensate for the loss of manpower.
Main Authors: | Chandler, Dawn, Dachos, John, DeBary-Kesner, Barbara, Howard, Jimmy, Springs, Sherry |
---|---|
Other Authors: | Science and Technology Directorate |
Published: |
Monterey, California. Naval Postgraduate School
2012
|
Online Access: | http://hdl.handle.net/10945/7088 |
Similar Items
-
Localized Electromagnetic Directed Disrupter Device (LED3) Test and Evaluation Plan for Option 2A
by: Chandler, Dawn, et al.
Published: (2012) -
Human Systems Integration Plan (HSIP) Outline Localized Electromagnetic Directed Disrupter Device (LED3)
by: Chandler, Dawn, et al.
Published: (2012) -
Human Systems Integration
by: Chandler, Dawn, et al.
Published: (2012) -
Southern Border Security Control
by: Chandler, Dawn, et al.
Published: (2012) -
Implementation of HSI Program Trading System
by: Wei-yang Kao, et al.
Published: (2009)