A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs

The goal of this thesis is to develop a model that Commander Naval Air Forces Pacific (CNAP) can use to estimate future TACAIR F/A-18 Aviation Depot Level Repair (AVDLR) costs. The thesis is divided into three sections. The first section discusses the methodology used to create a cost estimation mod...

Full description

Bibliographic Details
Main Author: Duma, David Paul.
Other Authors: Jones, Lawrence R.
Published: Monterey, California. Naval Postgraduate School 2012
Online Access:http://hdl.handle.net/10945/6108
id ndltd-nps.edu-oai-calhoun.nps.edu-10945-6108
record_format oai_dc
spelling ndltd-nps.edu-oai-calhoun.nps.edu-10945-61082014-11-27T16:06:21Z A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs Duma, David Paul. Jones, Lawrence R. Management The goal of this thesis is to develop a model that Commander Naval Air Forces Pacific (CNAP) can use to estimate future TACAIR F/A-18 Aviation Depot Level Repair (AVDLR) costs. The thesis is divided into three sections. The first section discusses the methodology used to create a cost estimation model. The second and third sections provide the results of the modelαs outcomes and compares and analyzes those results to the actual results. The modelαs estimate was 19% below Fiscal Year 2001αs actual costs. This shortfall was caused by a 27% increase in Navy C modelαs AVDLR costs, which is more than twice their average annual cost increase. Since Navy C models represent over 60% of CNAPαs total TACAIR F/A-18 AVDLR costs, this unexpected increase in costs is the major contributor to the modelαs 19% difference from its estimate. In order to correct this difference in the future it is recommended that the model shift from estimating yearly costs to estimating quarterly costs to become a more accurate cost-estimating model. 2012-03-14T17:47:47Z 2012-03-14T17:47:47Z 2001-12 Thesis http://hdl.handle.net/10945/6108 267031 This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, it may not be copyrighted. Monterey, California. Naval Postgraduate School
collection NDLTD
sources NDLTD
description The goal of this thesis is to develop a model that Commander Naval Air Forces Pacific (CNAP) can use to estimate future TACAIR F/A-18 Aviation Depot Level Repair (AVDLR) costs. The thesis is divided into three sections. The first section discusses the methodology used to create a cost estimation model. The second and third sections provide the results of the modelαs outcomes and compares and analyzes those results to the actual results. The modelαs estimate was 19% below Fiscal Year 2001αs actual costs. This shortfall was caused by a 27% increase in Navy C modelαs AVDLR costs, which is more than twice their average annual cost increase. Since Navy C models represent over 60% of CNAPαs total TACAIR F/A-18 AVDLR costs, this unexpected increase in costs is the major contributor to the modelαs 19% difference from its estimate. In order to correct this difference in the future it is recommended that the model shift from estimating yearly costs to estimating quarterly costs to become a more accurate cost-estimating model.
author2 Jones, Lawrence R.
author_facet Jones, Lawrence R.
Duma, David Paul.
author Duma, David Paul.
spellingShingle Duma, David Paul.
A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs
author_sort Duma, David Paul.
title A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs
title_short A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs
title_full A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs
title_fullStr A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs
title_full_unstemmed A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs
title_sort cost estimation model for commander naval air forces pacific's tacair f/a-18s aviation depot level repair costs
publisher Monterey, California. Naval Postgraduate School
publishDate 2012
url http://hdl.handle.net/10945/6108
work_keys_str_mv AT dumadavidpaul acostestimationmodelforcommandernavalairforcespacificstacairfa18saviationdepotlevelrepaircosts
AT dumadavidpaul costestimationmodelforcommandernavalairforcespacificstacairfa18saviationdepotlevelrepaircosts
_version_ 1716721039284633600