Benefits derived from capturing consumable supply costs by DRG as an input to physician practice pattern programs in military treatment facilities
Approved for public release, distribution unlimited === This thesis presents an in-depth analysis of the proposed Hazardous Material Minimization Center Concept projected to be prototyped in the Puget Sound, Washington area in an effort to optimize inventory levels. It examines preexisting Hazardous...
Main Author: | |
---|---|
Other Authors: | |
Language: | en_US |
Published: |
Monterey, California. Naval Postgraduate School
2014
|
Online Access: | http://hdl.handle.net/10945/42808 |