What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask

Approved for public release; distribution unlimited. === Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary o...

Full description

Bibliographic Details
Main Author: Sideris, George
Other Authors: Trietsch, Dan
Published: Monterey, California: Naval Postgraduate School 2013
Online Access:http://hdl.handle.net/10945/34830
id ndltd-nps.edu-oai-calhoun.nps.edu-10945-34830
record_format oai_dc
spelling ndltd-nps.edu-oai-calhoun.nps.edu-10945-348302015-05-06T03:58:47Z What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask Sideris, George Trietsch, Dan Papoulias, Photis Naval Postgraduate School (U.S.) Management Approved for public release; distribution unlimited. Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary of essential guidance for performance of functions; the interdependency of cost, quality, time, and performance; and a survey of techniques and methods for managing each of these parameters. A naval construction project can be one of the most difficult problems to manage and evaluate. This is largely due to the difficulty of measuring performance and its interaction with cost, quality, and time. In managing the performance, the results will vary according to the different forms, such as contract administration, formal views, financial and engineering reports, quality assurance and various status indexes. 2013-08-01T21:15:21Z 2013-08-01T21:15:21Z 1990-06 Thesis http://hdl.handle.net/10945/34830 Copyright is reserved by the copyright owner. Monterey, California: Naval Postgraduate School
collection NDLTD
sources NDLTD
description Approved for public release; distribution unlimited. === Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary of essential guidance for performance of functions; the interdependency of cost, quality, time, and performance; and a survey of techniques and methods for managing each of these parameters. A naval construction project can be one of the most difficult problems to manage and evaluate. This is largely due to the difficulty of measuring performance and its interaction with cost, quality, and time. In managing the performance, the results will vary according to the different forms, such as contract administration, formal views, financial and engineering reports, quality assurance and various status indexes.
author2 Trietsch, Dan
author_facet Trietsch, Dan
Sideris, George
author Sideris, George
spellingShingle Sideris, George
What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask
author_sort Sideris, George
title What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask
title_short What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask
title_full What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask
title_fullStr What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask
title_full_unstemmed What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask
title_sort what you always wanted to know about monitoring naval ship construction but you did not dare ask
publisher Monterey, California: Naval Postgraduate School
publishDate 2013
url http://hdl.handle.net/10945/34830
work_keys_str_mv AT siderisgeorge whatyoualwayswantedtoknowaboutmonitoringnavalshipconstructionbutyoudidnotdareask
_version_ 1716803317453029376