What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask
Approved for public release; distribution unlimited. === Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary o...
Main Author: | |
---|---|
Other Authors: | |
Published: |
Monterey, California: Naval Postgraduate School
2013
|
Online Access: | http://hdl.handle.net/10945/34830 |
id |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-34830 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-348302015-05-06T03:58:47Z What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask Sideris, George Trietsch, Dan Papoulias, Photis Naval Postgraduate School (U.S.) Management Approved for public release; distribution unlimited. Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary of essential guidance for performance of functions; the interdependency of cost, quality, time, and performance; and a survey of techniques and methods for managing each of these parameters. A naval construction project can be one of the most difficult problems to manage and evaluate. This is largely due to the difficulty of measuring performance and its interaction with cost, quality, and time. In managing the performance, the results will vary according to the different forms, such as contract administration, formal views, financial and engineering reports, quality assurance and various status indexes. 2013-08-01T21:15:21Z 2013-08-01T21:15:21Z 1990-06 Thesis http://hdl.handle.net/10945/34830 Copyright is reserved by the copyright owner. Monterey, California: Naval Postgraduate School |
collection |
NDLTD |
sources |
NDLTD |
description |
Approved for public release; distribution unlimited. === Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary of essential guidance for performance of functions; the interdependency of cost, quality, time, and performance; and a survey of techniques and methods for managing each of these parameters. A naval construction project can be one of the most difficult problems to manage and evaluate. This is largely due to the difficulty of measuring performance and its interaction with cost, quality, and time. In managing the performance, the results will vary according to the different forms, such as contract administration, formal views, financial and engineering reports, quality assurance and various status indexes. |
author2 |
Trietsch, Dan |
author_facet |
Trietsch, Dan Sideris, George |
author |
Sideris, George |
spellingShingle |
Sideris, George What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask |
author_sort |
Sideris, George |
title |
What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask |
title_short |
What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask |
title_full |
What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask |
title_fullStr |
What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask |
title_full_unstemmed |
What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask |
title_sort |
what you always wanted to know about monitoring naval ship construction but you did not dare ask |
publisher |
Monterey, California: Naval Postgraduate School |
publishDate |
2013 |
url |
http://hdl.handle.net/10945/34830 |
work_keys_str_mv |
AT siderisgeorge whatyoualwayswantedtoknowaboutmonitoringnavalshipconstructionbutyoudidnotdareask |
_version_ |
1716803317453029376 |