An investigation of possible discriminating earned value variables in Department of Defense major acquisition program cancellation
Approved for public release; distribution is unlimited === Some major defense acquisition programs (MDAPs) are cancelled while others are not. The research evaluates earned value (EV) data reported by 12 cancelled MDAPs and compares it to the EV data reported by 12 MDAPs that had significant cost ov...
Main Author: | |
---|---|
Other Authors: | |
Published: |
Monterey California: Naval Postgraduate School
2013
|
Online Access: | http://hdl.handle.net/10945/34677 |
id |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-34677 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-346772015-05-06T03:58:47Z An investigation of possible discriminating earned value variables in Department of Defense major acquisition program cancellation Hodgson, Sidney W.,III Angelis, Diana Armey, Laura Paulo, Eugene Department of Systems Engineering Approved for public release; distribution is unlimited Some major defense acquisition programs (MDAPs) are cancelled while others are not. The research evaluates earned value (EV) data reported by 12 cancelled MDAPs and compares it to the EV data reported by 12 MDAPs that had significant cost overruns yet were not cancelled (referred to as troubled programs). The study investigates whether there are differences in the key EV metrics reported for cancelled and troubled but not cancelled programs and seeks to develop a model that captures the probability of cancellation based on EV information. The thesis hypothesizes that cancelled programs would have more unfavorable cumulative cost and schedule variances, greater cost growth in the estimate at completion (EAC), and more disparity between the contractor and program manager cost estimates. Mann-Whitney tests were used to identify significant differences in EV metrics between the two groups and a probit model was used to further explore the relationship between EV information and the probability of program cancellation. The Mann Whitney and probit results, viewed together, suggest that early cost growth in a program may be an indicator of program cancellation. The thesis also suggests ways to improve EAC using probabilistic methods, including quantifying the level of cost risk associated with the EAC. 2013-08-01T16:51:40Z 2013-08-01T16:51:40Z 2013-06 http://hdl.handle.net/10945/34677 This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, it may not be copyrighted. Monterey California: Naval Postgraduate School |
collection |
NDLTD |
sources |
NDLTD |
description |
Approved for public release; distribution is unlimited === Some major defense acquisition programs (MDAPs) are cancelled while others are not. The research evaluates earned value (EV) data reported by 12 cancelled MDAPs and compares it to the EV data reported by 12 MDAPs that had significant cost overruns yet were not cancelled (referred to as troubled programs). The study investigates whether there are differences in the key EV metrics reported for cancelled and troubled but not cancelled programs and seeks to develop a model that captures the probability of cancellation based on EV information. The thesis hypothesizes that cancelled programs would have more unfavorable cumulative cost and schedule variances, greater cost growth in the estimate at completion (EAC), and more disparity between the contractor and program manager cost estimates. Mann-Whitney tests were used to identify significant differences in EV metrics between the two groups and a probit model was used to further explore the relationship between EV information and the probability of program cancellation. The Mann Whitney and probit results, viewed together, suggest that early cost growth in a program may be an indicator of program cancellation. The thesis also suggests ways to improve EAC using probabilistic methods, including quantifying the level of cost risk associated with the EAC. |
author2 |
Angelis, Diana |
author_facet |
Angelis, Diana Hodgson, Sidney W.,III |
author |
Hodgson, Sidney W.,III |
spellingShingle |
Hodgson, Sidney W.,III An investigation of possible discriminating earned value variables in Department of Defense major acquisition program cancellation |
author_sort |
Hodgson, Sidney W.,III |
title |
An investigation of possible discriminating earned value variables in Department of Defense major acquisition program cancellation |
title_short |
An investigation of possible discriminating earned value variables in Department of Defense major acquisition program cancellation |
title_full |
An investigation of possible discriminating earned value variables in Department of Defense major acquisition program cancellation |
title_fullStr |
An investigation of possible discriminating earned value variables in Department of Defense major acquisition program cancellation |
title_full_unstemmed |
An investigation of possible discriminating earned value variables in Department of Defense major acquisition program cancellation |
title_sort |
investigation of possible discriminating earned value variables in department of defense major acquisition program cancellation |
publisher |
Monterey California: Naval Postgraduate School |
publishDate |
2013 |
url |
http://hdl.handle.net/10945/34677 |
work_keys_str_mv |
AT hodgsonsidneywiii aninvestigationofpossiblediscriminatingearnedvaluevariablesindepartmentofdefensemajoracquisitionprogramcancellation AT hodgsonsidneywiii investigationofpossiblediscriminatingearnedvaluevariablesindepartmentofdefensemajoracquisitionprogramcancellation |