Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle.
Main Author: | Malcolm, David S. |
---|---|
Other Authors: | Boger, Dan C. |
Language: | en_US |
Published: |
Monterey, California. Naval Postgraduate School
2013
|
Online Access: | http://hdl.handle.net/10945/28438 |
Similar Items
-
Parametric cost estimation for amphibious assault vehicle's life cycle cost
by: Peters, Norman L.
Published: (2013) -
Autonomic logistic capability of the Advanced Amphibious Assault Vehicle
by: Mack, Paul G.
Published: (2012) -
Bandwidth requirements for the Advanced Amphibious Assault Vehicle (AAAV) command variant
by: Wedge, James P.
Published: (2012) -
Analysis and simulation of the Advanced Amphibious Assault Vehicle (AAAV) electrical system architecture
by: Beltran, Gabriel.
Published: (2013) -
Modeling and simulation in support of operational test and evaluation for the Advanced Amphibious Assault Vehicle (AAAV)
by: Kemp, Jesse A.
Published: (2012)