Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle.
Main Author: | |
---|---|
Other Authors: | |
Language: | en_US |
Published: |
Monterey, California. Naval Postgraduate School
2013
|
Online Access: | http://hdl.handle.net/10945/28438 |
id |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-28438 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-284382014-11-27T16:17:26Z Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle. Malcolm, David S. Boger, Dan C. NA NA Management 2013-02-15T23:33:15Z 2013-02-15T23:33:15Z 1991 Thesis http://hdl.handle.net/10945/28438 o640589493 en_US Monterey, California. Naval Postgraduate School |
collection |
NDLTD |
language |
en_US |
sources |
NDLTD |
author2 |
Boger, Dan C. |
author_facet |
Boger, Dan C. Malcolm, David S. |
author |
Malcolm, David S. |
spellingShingle |
Malcolm, David S. Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle. |
author_sort |
Malcolm, David S. |
title |
Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle. |
title_short |
Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle. |
title_full |
Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle. |
title_fullStr |
Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle. |
title_full_unstemmed |
Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle. |
title_sort |
parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle. |
publisher |
Monterey, California. Naval Postgraduate School |
publishDate |
2013 |
url |
http://hdl.handle.net/10945/28438 |
work_keys_str_mv |
AT malcolmdavids parametriccostestimationutilizingdevelopmenttoproductioncostrelationshipappliedtotheadvancedamphibiousassaultvehicle |
_version_ |
1716725018908426240 |