Cost estimation of software development and the implications for the program manager
Approved for public release; distribution is unlimited === Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program manag...
Main Author: | |
---|---|
Other Authors: | |
Language: | en_US |
Published: |
Monterey, California. Naval Postgraduate School
2012
|
Online Access: | http://hdl.handle.net/10945/23599 |
id |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-23599 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-235992015-08-06T16:03:10Z Cost estimation of software development and the implications for the program manager Doyle, Glenn Cameron San Miguel, Joseph G, Sovereign, Michael G. Naval Postgraduate School Department of Administrative Sciences Approved for public release; distribution is unlimited Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program managers are responsible for estimating a program's using the information provided by the contractor and the cost analysis divisions within the System Commands. This study first analyzes why variance exists between the different estimates for the same software project that are provided to the Program Manager as input to the budget estimate. This study then examines four methods that are used to understand and reduce the variance between the estimates to give the Program Manager more control over the software development cost estimation process. A set of five specific decision rules is developed for the Program Manager to implement in the cost estimation process. The intent of the study is to improve the accuracy of the cost estimate by reducing variance between the independently generated estimate submitted to the Program Manager. 2012-11-29T16:13:58Z 2012-11-29T16:13:58Z 1992-06 Thesis http://hdl.handle.net/10945/23599 en_US This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, it may not be copyrighted. Monterey, California. Naval Postgraduate School |
collection |
NDLTD |
language |
en_US |
sources |
NDLTD |
description |
Approved for public release; distribution is unlimited === Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program managers are responsible for estimating a program's using the information provided by the contractor and the cost analysis divisions within the System Commands. This study first analyzes why variance exists between the different estimates for the same software project that are provided to the Program Manager as input to the budget estimate. This study then examines four methods that are used to understand and reduce the variance between the estimates to give the Program Manager more control over the software development cost estimation process. A set of five specific decision rules is developed for the Program Manager to implement in the cost estimation process. The intent of the study is to improve the accuracy of the cost estimate by reducing variance between the independently generated estimate submitted to the Program Manager. |
author2 |
San Miguel, Joseph G, |
author_facet |
San Miguel, Joseph G, Doyle, Glenn Cameron |
author |
Doyle, Glenn Cameron |
spellingShingle |
Doyle, Glenn Cameron Cost estimation of software development and the implications for the program manager |
author_sort |
Doyle, Glenn Cameron |
title |
Cost estimation of software development and the implications for the program manager |
title_short |
Cost estimation of software development and the implications for the program manager |
title_full |
Cost estimation of software development and the implications for the program manager |
title_fullStr |
Cost estimation of software development and the implications for the program manager |
title_full_unstemmed |
Cost estimation of software development and the implications for the program manager |
title_sort |
cost estimation of software development and the implications for the program manager |
publisher |
Monterey, California. Naval Postgraduate School |
publishDate |
2012 |
url |
http://hdl.handle.net/10945/23599 |
work_keys_str_mv |
AT doyleglenncameron costestimationofsoftwaredevelopmentandtheimplicationsfortheprogrammanager |
_version_ |
1716816370179506176 |