Cost estimation of software development and the implications for the program manager

Approved for public release; distribution is unlimited === Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program manag...

Full description

Bibliographic Details
Main Author: Doyle, Glenn Cameron
Other Authors: San Miguel, Joseph G
Language:en_US
Published: Monterey, California. Naval Postgraduate School 2012
Online Access:http://hdl.handle.net/10945/23599
id ndltd-nps.edu-oai-calhoun.nps.edu-10945-23599
record_format oai_dc
spelling ndltd-nps.edu-oai-calhoun.nps.edu-10945-235992015-08-06T16:03:10Z Cost estimation of software development and the implications for the program manager Doyle, Glenn Cameron San Miguel, Joseph G, Sovereign, Michael G. Naval Postgraduate School Department of Administrative Sciences Approved for public release; distribution is unlimited Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program managers are responsible for estimating a program's using the information provided by the contractor and the cost analysis divisions within the System Commands. This study first analyzes why variance exists between the different estimates for the same software project that are provided to the Program Manager as input to the budget estimate. This study then examines four methods that are used to understand and reduce the variance between the estimates to give the Program Manager more control over the software development cost estimation process. A set of five specific decision rules is developed for the Program Manager to implement in the cost estimation process. The intent of the study is to improve the accuracy of the cost estimate by reducing variance between the independently generated estimate submitted to the Program Manager. 2012-11-29T16:13:58Z 2012-11-29T16:13:58Z 1992-06 Thesis http://hdl.handle.net/10945/23599 en_US This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, it may not be copyrighted. Monterey, California. Naval Postgraduate School
collection NDLTD
language en_US
sources NDLTD
description Approved for public release; distribution is unlimited === Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program managers are responsible for estimating a program's using the information provided by the contractor and the cost analysis divisions within the System Commands. This study first analyzes why variance exists between the different estimates for the same software project that are provided to the Program Manager as input to the budget estimate. This study then examines four methods that are used to understand and reduce the variance between the estimates to give the Program Manager more control over the software development cost estimation process. A set of five specific decision rules is developed for the Program Manager to implement in the cost estimation process. The intent of the study is to improve the accuracy of the cost estimate by reducing variance between the independently generated estimate submitted to the Program Manager.
author2 San Miguel, Joseph G,
author_facet San Miguel, Joseph G,
Doyle, Glenn Cameron
author Doyle, Glenn Cameron
spellingShingle Doyle, Glenn Cameron
Cost estimation of software development and the implications for the program manager
author_sort Doyle, Glenn Cameron
title Cost estimation of software development and the implications for the program manager
title_short Cost estimation of software development and the implications for the program manager
title_full Cost estimation of software development and the implications for the program manager
title_fullStr Cost estimation of software development and the implications for the program manager
title_full_unstemmed Cost estimation of software development and the implications for the program manager
title_sort cost estimation of software development and the implications for the program manager
publisher Monterey, California. Naval Postgraduate School
publishDate 2012
url http://hdl.handle.net/10945/23599
work_keys_str_mv AT doyleglenncameron costestimationofsoftwaredevelopmentandtheimplicationsfortheprogrammanager
_version_ 1716816370179506176