Contracting issues associated with reduction of Repair Turnaround Time within the Contract Depot Maintenance (CDM)--program.
Main Authors: | Petty, Roger Ellsworth., Smith, Raymond W., McMasters, Alan W. |
---|---|
Language: | en_US |
Published: |
2012
|
Online Access: | http://hdl.handle.net/10945/22696 |
Similar Items
-
Maintenance service contracting.
by: Long, Gregory R.
Published: (2012) -
Assessing the Executive Efficiency and Productivity of Taiwan’s Government- Owned / Company- Operated Maintenance Contract: A Case Study of the 2nd Logistics Depot ROCAF Outsourcing Contract
by: Hsieh,Keng-Shun, et al.
Published: (2013) -
Budgeting for repairable secondary items at the Naval Electronic Systems Command.
by: Hanson, Ryan L., et al.
Published: (2012) -
The contract pricing and repair policy of the maintenance contractor for extended warranty under repair time threshold
by: Chiung-Yao Cheng, et al.
Published: (2016) -
Contracting for Road Maintenance in the Netherlands—The Downside of Performance-Based Contracting
by: Cees J. Gelderman, et al.
Published: (2019-07-01)