A proposed material requirements planning system for NARF Alameda.

The United States Navy is currently implementing a plan to consolidate the wholesale supply functions of the Naval Air Station at Alameda and the Naval Supply Center at Oakland. Improving supply support of the Naval Air Rework Facility Alameda in general and stock availability in particular is a vit...

Full description

Bibliographic Details
Main Author: Eylon, Barauch
Other Authors: NA
Language:en_US
Published: Monterey, California. Naval Postgraduate School 2012
Online Access:http://hdl.handle.net/10945/19025
id ndltd-nps.edu-oai-calhoun.nps.edu-10945-19025
record_format oai_dc
spelling ndltd-nps.edu-oai-calhoun.nps.edu-10945-190252014-11-27T16:13:02Z A proposed material requirements planning system for NARF Alameda. Eylon, Barauch NA NA NA NA The United States Navy is currently implementing a plan to consolidate the wholesale supply functions of the Naval Air Station at Alameda and the Naval Supply Center at Oakland. Improving supply support of the Naval Air Rework Facility Alameda in general and stock availability in particular is a vital part of the plan. Demand forecasting by workload driven material requirements planning (MRP) is being considered as a means to improve stock availability. This thesis begins with an overview of the MRP technique and the current supply support of NARF Alameda. It proceeds with the description and evaluation of a temporary MRP system that is currently implemented and uses it as a background for development of an MRP system that is designed to operate in a maintenance oriented environment in general and at NARF Alameda in particular. Finally, suggestions are made for transition from the temporary to the proposed system. (Author) 2012-11-16T21:01:38Z 2012-11-16T21:01:38Z 1980 Thesis http://hdl.handle.net/10945/19025 o640300703 en_US Monterey, California. Naval Postgraduate School
collection NDLTD
language en_US
sources NDLTD
description The United States Navy is currently implementing a plan to consolidate the wholesale supply functions of the Naval Air Station at Alameda and the Naval Supply Center at Oakland. Improving supply support of the Naval Air Rework Facility Alameda in general and stock availability in particular is a vital part of the plan. Demand forecasting by workload driven material requirements planning (MRP) is being considered as a means to improve stock availability. This thesis begins with an overview of the MRP technique and the current supply support of NARF Alameda. It proceeds with the description and evaluation of a temporary MRP system that is currently implemented and uses it as a background for development of an MRP system that is designed to operate in a maintenance oriented environment in general and at NARF Alameda in particular. Finally, suggestions are made for transition from the temporary to the proposed system. (Author)
author2 NA
author_facet NA
Eylon, Barauch
author Eylon, Barauch
spellingShingle Eylon, Barauch
A proposed material requirements planning system for NARF Alameda.
author_sort Eylon, Barauch
title A proposed material requirements planning system for NARF Alameda.
title_short A proposed material requirements planning system for NARF Alameda.
title_full A proposed material requirements planning system for NARF Alameda.
title_fullStr A proposed material requirements planning system for NARF Alameda.
title_full_unstemmed A proposed material requirements planning system for NARF Alameda.
title_sort proposed material requirements planning system for narf alameda.
publisher Monterey, California. Naval Postgraduate School
publishDate 2012
url http://hdl.handle.net/10945/19025
work_keys_str_mv AT eylonbarauch aproposedmaterialrequirementsplanningsystemfornarfalameda
AT eylonbarauch proposedmaterialrequirementsplanningsystemfornarfalameda
_version_ 1716723160017010688