Statistical analysis of naval aviation depot repair cycle time reduction for the F/A-18 C/D aircraft
Reducing U.S. Navy inventory control problems associated with the F/ A-18 C/D aircraft is critical to maintaining squadron readiness while minimizing procurement and repair costs. The Navy's Inventory Control Point has designed its Carcass Express program to ensure that critically short depot l...
Main Author: | Grunzke, Shawn D. |
---|---|
Other Authors: | Koyak, Robert |
Format: | Others |
Published: |
Monterey, California. Naval Postgraduate School
2012
|
Online Access: | http://hdl.handle.net/10945/1211 |
Similar Items
-
Repair cycle time reduction at Naval Aviation Depots via reduced Logistics Delay Time
by: Cruz, David F.
Published: (2012) -
Analysis of consolidating naval aviation depots.
by: Krentz, Donald J.
Published: (2013) -
A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs
by: Duma, David Paul.
Published: (2012) -
Measuring customer satisfaction of depot maintenance: an analysis of customer satisfaction of F/A-18 maintenance at Naval Aviation Depot North Island, CA
by: Forsyth, Brian A
Published: (2012) -
Suitability of MRP II to material planning for component repair at Naval Aviation Depot, North Island.
by: O'Brien, Timothy J.
Published: (2012)