Analysis and application of earned value management to the Naval Construction Force
This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing...
Main Author: | |
---|---|
Other Authors: | |
Published: |
2012
|
Online Access: | http://hdl.handle.net/10945/10949 |
id |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-10949 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-nps.edu-oai-calhoun.nps.edu-10945-109492014-11-27T16:09:20Z Analysis and application of earned value management to the Naval Construction Force Hayes, Richard D. Engineering This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing an Earned Value Management System is provided from an extensive literature review on the subject matter. Application to the Naval Construction Force is made through comparison with existing project management fundamentals and sample project analysis. While these existing fundamentals include some of the basics components of earned value analysis, a full utilization of the analysis and forecasting techniques afforded by the earned value approach is not in place. Conclusions and recommendations for future research are presented. 2012-08-22T15:34:26Z 2012-08-22T15:34:26Z 2001-06 Thesis http://hdl.handle.net/10945/10949 This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, it may not be copyrighted. |
collection |
NDLTD |
sources |
NDLTD |
description |
This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing an Earned Value Management System is provided from an extensive literature review on the subject matter. Application to the Naval Construction Force is made through comparison with existing project management fundamentals and sample project analysis. While these existing fundamentals include some of the basics components of earned value analysis, a full utilization of the analysis and forecasting techniques afforded by the earned value approach is not in place. Conclusions and recommendations for future research are presented. |
author2 |
Engineering |
author_facet |
Engineering Hayes, Richard D. |
author |
Hayes, Richard D. |
spellingShingle |
Hayes, Richard D. Analysis and application of earned value management to the Naval Construction Force |
author_sort |
Hayes, Richard D. |
title |
Analysis and application of earned value management to the Naval Construction Force |
title_short |
Analysis and application of earned value management to the Naval Construction Force |
title_full |
Analysis and application of earned value management to the Naval Construction Force |
title_fullStr |
Analysis and application of earned value management to the Naval Construction Force |
title_full_unstemmed |
Analysis and application of earned value management to the Naval Construction Force |
title_sort |
analysis and application of earned value management to the naval construction force |
publishDate |
2012 |
url |
http://hdl.handle.net/10945/10949 |
work_keys_str_mv |
AT hayesrichardd analysisandapplicationofearnedvaluemanagementtothenavalconstructionforce |
_version_ |
1716721592882429952 |