Analysis and application of earned value management to the Naval Construction Force

This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing...

Full description

Bibliographic Details
Main Author: Hayes, Richard D.
Other Authors: Engineering
Published: 2012
Online Access:http://hdl.handle.net/10945/10949
id ndltd-nps.edu-oai-calhoun.nps.edu-10945-10949
record_format oai_dc
spelling ndltd-nps.edu-oai-calhoun.nps.edu-10945-109492014-11-27T16:09:20Z Analysis and application of earned value management to the Naval Construction Force Hayes, Richard D. Engineering This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing an Earned Value Management System is provided from an extensive literature review on the subject matter. Application to the Naval Construction Force is made through comparison with existing project management fundamentals and sample project analysis. While these existing fundamentals include some of the basics components of earned value analysis, a full utilization of the analysis and forecasting techniques afforded by the earned value approach is not in place. Conclusions and recommendations for future research are presented. 2012-08-22T15:34:26Z 2012-08-22T15:34:26Z 2001-06 Thesis http://hdl.handle.net/10945/10949 This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, it may not be copyrighted.
collection NDLTD
sources NDLTD
description This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing an Earned Value Management System is provided from an extensive literature review on the subject matter. Application to the Naval Construction Force is made through comparison with existing project management fundamentals and sample project analysis. While these existing fundamentals include some of the basics components of earned value analysis, a full utilization of the analysis and forecasting techniques afforded by the earned value approach is not in place. Conclusions and recommendations for future research are presented.
author2 Engineering
author_facet Engineering
Hayes, Richard D.
author Hayes, Richard D.
spellingShingle Hayes, Richard D.
Analysis and application of earned value management to the Naval Construction Force
author_sort Hayes, Richard D.
title Analysis and application of earned value management to the Naval Construction Force
title_short Analysis and application of earned value management to the Naval Construction Force
title_full Analysis and application of earned value management to the Naval Construction Force
title_fullStr Analysis and application of earned value management to the Naval Construction Force
title_full_unstemmed Analysis and application of earned value management to the Naval Construction Force
title_sort analysis and application of earned value management to the naval construction force
publishDate 2012
url http://hdl.handle.net/10945/10949
work_keys_str_mv AT hayesrichardd analysisandapplicationofearnedvaluemanagementtothenavalconstructionforce
_version_ 1716721592882429952