Enhancing the enhanced scenario-based method of cost risk analysis
The current S-Curve method of cost risk analysis for major DON acquisitions projects does not accurately estimate actual cost when the program reaches Full Rate Production. Another, sometimes more effective method of measuring cost risk, is by using the enhanced scenario-based method (eSBM) of risk...
Main Author: | Hooper, Seth T. |
---|---|
Other Authors: | Nussbaum, Daniel |
Published: |
Monterey, California. Naval Postgraduate School
2012
|
Online Access: | http://hdl.handle.net/10945/10622 |
Similar Items
-
THE ENHANCEMENT OF RISK UPDATING USING SCENARIO ANALYSIS METHOD
by: ANANDA ARTHAMASTU ABDURASYAD, et al.
Published: (2013) -
Advanced Scenario Analysis: Tools for Enhancing Social Resiliency
Published: (2011) -
Using Scenario Method to Enhance the Process of Creativity for Cross-Functional Team
by: Tz-HanChen, et al.
Published: (2013) -
Evaluating the impact of response enhancement methods on the risk of nonresponse bias and survey costs
by: Caroline Roberts, et al.
Published: (2014-08-01) -
Scenario-Planning Method for Cost Estimation Using Morphological Analysis
by: Sae-Hyun Ji, et al.
Published: (2019-01-01)