Enhancing the enhanced scenario-based method of cost risk analysis

The current S-Curve method of cost risk analysis for major DON acquisitions projects does not accurately estimate actual cost when the program reaches Full Rate Production. Another, sometimes more effective method of measuring cost risk, is by using the enhanced scenario-based method (eSBM) of risk...

Full description

Bibliographic Details
Main Author: Hooper, Seth T.
Other Authors: Nussbaum, Daniel
Published: Monterey, California. Naval Postgraduate School 2012
Online Access:http://hdl.handle.net/10945/10622
id ndltd-nps.edu-oai-calhoun.nps.edu-10945-10622
record_format oai_dc
spelling ndltd-nps.edu-oai-calhoun.nps.edu-10945-106222015-05-06T03:58:18Z Enhancing the enhanced scenario-based method of cost risk analysis Hooper, Seth T. Nussbaum, Daniel Gates, William Graduate School of Business & Public Policy (GSBPP) The current S-Curve method of cost risk analysis for major DON acquisitions projects does not accurately estimate actual cost when the program reaches Full Rate Production. Another, sometimes more effective method of measuring cost risk, is by using the enhanced scenario-based method (eSBM) of risk analysis. The reason that cost estimations from the milestone B costs are inaccurate is that very little, if any, real information about the project is known. eSBM allows managers a less statistically tasking method of determining cost risk for a project while still maintaining the requirements of the Weapons System Acquisitions Reform Act. The key factors in measuring the usefulness of eSBM should be focused on the acquisition strategy being used for the project and the time frame from Milestone B to later Milestones. I presume that different acquisition strategies will yield different levels of success in estimating cost risk for eSBM. 2012-08-22T15:33:00Z 2012-08-22T15:33:00Z 2011-12 http://hdl.handle.net/10945/10622 This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, it may not be copyrighted. Monterey, California. Naval Postgraduate School
collection NDLTD
sources NDLTD
description The current S-Curve method of cost risk analysis for major DON acquisitions projects does not accurately estimate actual cost when the program reaches Full Rate Production. Another, sometimes more effective method of measuring cost risk, is by using the enhanced scenario-based method (eSBM) of risk analysis. The reason that cost estimations from the milestone B costs are inaccurate is that very little, if any, real information about the project is known. eSBM allows managers a less statistically tasking method of determining cost risk for a project while still maintaining the requirements of the Weapons System Acquisitions Reform Act. The key factors in measuring the usefulness of eSBM should be focused on the acquisition strategy being used for the project and the time frame from Milestone B to later Milestones. I presume that different acquisition strategies will yield different levels of success in estimating cost risk for eSBM.
author2 Nussbaum, Daniel
author_facet Nussbaum, Daniel
Hooper, Seth T.
author Hooper, Seth T.
spellingShingle Hooper, Seth T.
Enhancing the enhanced scenario-based method of cost risk analysis
author_sort Hooper, Seth T.
title Enhancing the enhanced scenario-based method of cost risk analysis
title_short Enhancing the enhanced scenario-based method of cost risk analysis
title_full Enhancing the enhanced scenario-based method of cost risk analysis
title_fullStr Enhancing the enhanced scenario-based method of cost risk analysis
title_full_unstemmed Enhancing the enhanced scenario-based method of cost risk analysis
title_sort enhancing the enhanced scenario-based method of cost risk analysis
publisher Monterey, California. Naval Postgraduate School
publishDate 2012
url http://hdl.handle.net/10945/10622
work_keys_str_mv AT hoopersetht enhancingtheenhancedscenariobasedmethodofcostriskanalysis
_version_ 1716803119646507008