Cost valuation: a model for comparing dissimilar aircraft platforms
MBA Professional Report === The purpose of this MBA Project was to investigate and provide an overview of current cost valuation methods used to compare aircraft and then determine if the current methods were satisfactory for comparing dissimilar aircraft platforms. The goal of the project was to de...
Main Author: | |
---|---|
Other Authors: | |
Published: |
Monterey, California. Naval Postgraduate School
2012
|
Online Access: | http://hdl.handle.net/10945/10086 |
Summary: | MBA Professional Report === The purpose of this MBA Project was to investigate and provide an overview of current cost valuation methods used to compare aircraft and then determine if the current methods were satisfactory for comparing dissimilar aircraft platforms. The goal of the project was to develop a model using OandS and procurement cost inputs together with aircraft inventory and utilization data in order to produce a cost per unit hour for any given aircraft. A demonstration of the modelb2ss validity using aircraft and cost data from the Predator UAV and the F-16 was then performed to illustrate how it can be used to aid comparisons of dissimilar aircraft platforms that perform similar missions. |
---|