The constraints of using design and build for the procurement of construction projects in South Africa

=== Despite the numerous advantages that design and build has as a procurement method for construction projects, which have made it the procurement method of choice for construction projects in Europe and North America, not many South African construction companies are making use of it. This study...

Full description

Bibliographic Details
Main Author: Mfongeh, Ndonwi Gerald
Format: Others
Language:en
Published: 2010
Subjects:
Online Access:http://hdl.handle.net/10539/8800
id ndltd-netd.ac.za-oai-union.ndltd.org-wits-oai-wiredspace.wits.ac.za-10539-8800
record_format oai_dc
spelling ndltd-netd.ac.za-oai-union.ndltd.org-wits-oai-wiredspace.wits.ac.za-10539-88002019-05-11T03:40:47Z The constraints of using design and build for the procurement of construction projects in South Africa Mfongeh, Ndonwi Gerald Construction contracts--South Africa--Management Despite the numerous advantages that design and build has as a procurement method for construction projects, which have made it the procurement method of choice for construction projects in Europe and North America, not many South African construction companies are making use of it. This study investigates the constraints which are associated with design and build in South Africa. It also seeks to find out how certain performance indicators in construction fare when design and build is used. It then proposes recommendations on how the method can be improved in order to increase its use in South Africa. Data for the study was collected from six major professions in the construction industry including contractors, engineers, quantity surveyors, project owners, project managers and architects in order to give a more balanced view of the problems. Questionnaires, emails and telephonic conversations were methods used to collect the data. Sample t-tests were then conducted on the data using the statistical package, Statistical Analysis Systems (SAS). The results obtained show that there are numerous problems faced in all phases of construction projects when design and build is used as the procurement method of choice in South Africa. Most of the problems are around the issues of inadequate knowledge by project owners in construction, and also the unavailability of manpower to help owners with technical issues. Of the performance indicators investigated, time management and project quality are found to perform poorly. Project owners should deploy their own project managers in the construction process 2010-09-27T09:03:46Z 2010-09-27T09:03:46Z 2010-09-27 Thesis http://hdl.handle.net/10539/8800 en application/pdf application/pdf application/pdf
collection NDLTD
language en
format Others
sources NDLTD
topic Construction contracts--South Africa--Management



spellingShingle Construction contracts--South Africa--Management



Mfongeh, Ndonwi Gerald
The constraints of using design and build for the procurement of construction projects in South Africa
description === Despite the numerous advantages that design and build has as a procurement method for construction projects, which have made it the procurement method of choice for construction projects in Europe and North America, not many South African construction companies are making use of it. This study investigates the constraints which are associated with design and build in South Africa. It also seeks to find out how certain performance indicators in construction fare when design and build is used. It then proposes recommendations on how the method can be improved in order to increase its use in South Africa. Data for the study was collected from six major professions in the construction industry including contractors, engineers, quantity surveyors, project owners, project managers and architects in order to give a more balanced view of the problems. Questionnaires, emails and telephonic conversations were methods used to collect the data. Sample t-tests were then conducted on the data using the statistical package, Statistical Analysis Systems (SAS). The results obtained show that there are numerous problems faced in all phases of construction projects when design and build is used as the procurement method of choice in South Africa. Most of the problems are around the issues of inadequate knowledge by project owners in construction, and also the unavailability of manpower to help owners with technical issues. Of the performance indicators investigated, time management and project quality are found to perform poorly. Project owners should deploy their own project managers in the construction process
author Mfongeh, Ndonwi Gerald
author_facet Mfongeh, Ndonwi Gerald
author_sort Mfongeh, Ndonwi Gerald
title The constraints of using design and build for the procurement of construction projects in South Africa
title_short The constraints of using design and build for the procurement of construction projects in South Africa
title_full The constraints of using design and build for the procurement of construction projects in South Africa
title_fullStr The constraints of using design and build for the procurement of construction projects in South Africa
title_full_unstemmed The constraints of using design and build for the procurement of construction projects in South Africa
title_sort constraints of using design and build for the procurement of construction projects in south africa
publishDate 2010
url http://hdl.handle.net/10539/8800
work_keys_str_mv AT mfongehndonwigerald theconstraintsofusingdesignandbuildfortheprocurementofconstructionprojectsinsouthafrica
AT mfongehndonwigerald constraintsofusingdesignandbuildfortheprocurementofconstructionprojectsinsouthafrica
_version_ 1719082880048562176