The quantification of grade uncertainty, and associated risk, and their influence on pit optimisation for the Sadiola deep sulphide prefeasability project
In order to quantify the uncertainty in the grade estimate for the Sadiola Deep Sulphide Prefeasibility Project a conditional simulation model was generated using Direct Block Simulation methodology. Compared to conventional Sequential Gaussian Simulation, the Direct Block Simulation algorithm pr...
Main Author: | Robins, Steven Paul |
---|---|
Format: | Others |
Language: | en |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10539/5890 |
Similar Items
-
Hybrid model for uncertainty assessment in open pit optimization
by: Stevanović Dejan R., et al.
Published: (2020-01-01) -
Incorporation of geological uncertainty in pit optimization with geostatistics simulation
by: Rafael Alvarenga Souza, et al. -
Uncertainty Representation Method for Open Pit Optimization Results Due to Variation in Mineral Prices
by: Jieun Baek, et al.
Published: (2016-02-01) -
The Time Value of Risk - A Case Study at the Boron Operations Open Pit Mine
by: Yost, Raymond Richard
Published: (2009) -
Numerical and Experimental Evaluation of Pitting Corrosion of CUSTOM 450 Stainless Steel Alloy in Chloride Environment
by: Y. Mollapour, et al.
Published: (2021-09-01)