Overall improvement in production drilling efficiency at Grootegeluk Coal Mine, to meet current and future drilling demand
A research report submitted to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, in fulfilment of the requirements for the degree of Master of Science in Engineering(Mining), 2020 === Production drilling capacity at Grootegeluk mine needs to be sustained to ensur...
Main Author: | |
---|---|
Format: | Others |
Language: | en |
Published: |
2021
|
Online Access: | https://hdl.handle.net/10539/31142 |