Geometallurgical analysis - Implications of operating flexibility (A case for Geometallurgy for Orapa A/K1 deposit)
Historically, many mining investments have demonstrated inability to meet projected cash-flows despite detailed and costly project evaluations. The risk in mining projects can be attributed to the fact that decisions are made in situations involving high levels of uncertainty. The cash-flow uncertai...
Main Author: | Chibaya, Ashley |
---|---|
Format: | Others |
Language: | en |
Published: |
2014
|
Online Access: | http://hdl.handle.net10539/13835 |
Similar Items
-
Geometallurgy—A Route to More Resilient Mine Operations
by: Simon C. Dominy, et al.
Published: (2018-12-01) -
Geometallurgical Flowsheet as a Tool for Designing and Communicating Geometallurgical Programs
by: Aleksandra Maria Lang, et al.
Published: (2018-08-01) -
Depositional processes in a kimberlite crater: the Upper Cretaceous Orapa South Pipe (Botswana)
by: Gernon, Thomas M., et al.
Published: (2009) -
Pyroclastic flow deposits from a kimberlite eruption: The Orapa South Crater, Botswana
by: Gernon, T.M, et al.
Published: (2009) -
PETROGRAPHY AND MINERAL CHEMISTRY OF ULTRAMAFIC AND RELATED INCLUSIONS FROM THE ORAPA A/K-1 KIMBERLITE PIPE, BOTSWANA
by: TOLLO, RICHARD PAUL
Published: (1982)