An analysis of challenges in implementing an equipment reliability improvement strategy : case study Eskom Camden Power Station
In the late 2000s Eskom has been committed in maintaining and improving the levels of plant performance. Eskom main focus was on improving the production critical equipment reliability. Eskom Asset Management Department (AMD) established a strategy of optimising maintenance basis, namely Reliability...
Main Author: | Tsekoa, Keiso Lebohang |
---|---|
Other Authors: | Visser, J.K. (Jacobus) |
Published: |
University of Pretoria
2017
|
Subjects: | |
Online Access: | http://hdl.handle.net/2263/62797 Tsekoa, KL 2017, An analysis of challenges in implementing an equipment reliability improvement strategy : case study Eskom Camden Power Station, MSc Dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/62797> |
Similar Items
-
Assessing corporate social responsibility on sustainable community development at Eskom : a case of Camden and Grootvlei Power Stations
by: Botshe, Andrew Ramabele
Published: (2017) -
Management challanges regarding employees with disabilities at Eskom Gauteng : an EAP experience
by: Solombela, Babalwa
Published: (2020) -
Eskom : the making, unmaking and remaking of an institution - a case study
by: Maharaj, Ravendra Omarsunker
Published: (2013) -
Impact of coal quality on equipment lifetime at coal-fired power stations
by: Van der Westhuizen, Bernard Cornelius
Published: (2021) -
Optimum time to refurbish a boiler feed pump at Eskom's power stations
by: Mortlock, Steven Peter
Published: (2014)