Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station
Includes bibliographical references (leaves 79-83).
Main Author: | Kabia, John Amara |
---|---|
Format: | Dissertation |
Language: | English |
Published: |
University of Cape Town
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/11427/5526 |
Similar Items
-
Strategies Application in Project Evaluation - The Case of Bumbuna Hydroelectric Project (BHP), Sierra Leone
by: Bakar Mansaray, et al.
Published: (2007-03-01) -
History of studies on Belo Monte hydroelectric power station
by: VF. Saracura -
Study of a Hydrodynamic Thrust Bearing for Hydroelectric Power Stations
by: Francisco Morais Magalhães Marques de Sousa
Published: (2019) -
To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction
by: V. Kh. Nasibov
Published: (2006-10-01) -
Influence of Small Hydroelectric Power Stations on River Water Quality
by: Xana Álvarez, et al.
Published: (2020-01-01)